Hydro Tech Pak (Pvt.) Ltd. has been developing / Constructing Hydropower Projects on EPC Basis since 2009 for Power Development Organization (earlier named as Hydro Electric Board Azad Jammu & Kashmir).

Hydro Tech Pak (Pvt.) Ltd. has also started developing / Constructing Hydropower Projects on EPC Basis for Water and Power Division Gilgit Baltistan

Completed Development/Construction Projects
1. 3 MW Sharda Hydro Power Project, AJK.

The EPC contract for Design, Supply, Erection, Testing and Commissioning of 3 MW Sharda HPP AJK was awarded to us by Power Development Organization Azad Jammu and Kahsmir (PDO), formerly known as Hydro Electric Board, HEB, in 2009. We Successfully Completed the Development/ Construction of the Power Plant and handed over the project to the Client in 2015. The Corrective maintenance / replacement of parts during 12 months Defect Liability Period is being carried out.

Silent Features

Type of Plant:Hydel, Run-Off the River, Horizontal Shaft Francis Turbines

Number and rated capacity of units:  Three units, 1MW each

Status of Plant: Commercially Operational since December 2, 2015.

2. 3 MW Qadirabad Hydro Power Project, AJK.

The EPC contract for Design, Supply, Erection, Testing and Commissioning of 3 MW Qadirabad HPP – District Bagh, AJK was awarded to us by Power Development Organization Azad Jammu and Kahsmir (PDO), formerly known as (Hydro Electric Board, HEB) in 2010. We Successfully Completed the Development/ Construction of the Power Plant and handed over the project to the Client in 2013. The Corrective maintenance / replacement of parts during 12 months Defect Liability has been successfully carried out.

Silent Features

Type of plant:Hydel, Run-Off the River, Horizontal Shaft Pelton Turbines

Number and rated capacity of units: Two units, 1.5MW each

Status of plant : Commercially Operational since July 27, 2013.

In Hand Development/Construction Projects
1. 2×500 KW Galetar Hydro Power Project - AJK (2015)

In the Result of our Performance in the previous projects with PDO the PDO AJK awarded us The EPC contract for Design, Supply, Erection, Testing and Commissioning of 02×500 KW Galetar Hydro Power Project – District Kotli AJK in 2015.

Silent Features

Type of plant :Hydel, Run-Off the River, Horizontal Shaft Pelton Turbines

Number and rated capacity of units : Two, 500KW each

Status of plant : Construction Phase.

2. 1×2000KW Kapa Banamula Hydro Power Project - AJK (2015)

In the View of our Expertise in this field The PDO AJK awarded us the EPC contract for Design, Supply, Erection, Testing and Commissioning of 1×2000KW Kapa Banamula Hydro Power Project – Leepa Valley District Hattian Bala, AJK in 2015.

Silent Features

Type of plant :Hydel, Run-Off the River, Horizontal Shaft Pelton Turbines

Number and rated capacity of units : One , 2000KW each

Status of plant : Construction Phase.

3. 2×250KW Kel (Upgradation) Hydro Power Project - AJK (2016)

PDO AJK awarded us the EPC contract for Design, Supply, Erection, Testing and Commissioning of 2×250KW Kel (Upgradation) Hydro Power Project – District Neelum AJK in 2016.

Silent Features

Type of plant:Hydel, Run-Off the River, Horizontal Shaft Pelton Turbines

Number and rated capacity of units : Two, 250KW each

Status of plant : Construction Phase.

4. 2×500KW Bhedi Doba Hydro Power Project – AJK (2016)

The EPC contract for Design, Supply, Erection, Testing and Commissioning of 2×500KW Bhedi Doba HPP – District Haveli Kahuta AJKwas awarded to us by PDO AJK. In 2016.

Silent Features

Type of Plant :Hydel, Run-Off the River, Horizontal Shaft Pelton Turbines

Number and Rated capacity of units : Two, 500KW each

Status of Plant : Construction Phase.

5. 1 MW Manikal Darel HPP

Owing to our Renowned Experience and Performance in the relevant field, The Water and PowerDivision,Diamir,  Chillas has issued us the contract for Supply, Installation, Commissioning and Test Running of 1 MW Manikal Darel HPP in November, 2016.